fbpx

© L-Charge. All rights reserved.

Buy an ultra-fast eletricity
(0,25-0,6 $ per kWh)
from off-grid station
for your business
  1. Limited offer for USA
  2. Limited number of stations
Participation in events
Previous event:
NOV 28-30, 2023, UK, LONDON, ExCel LONDON
Next event:
MAY 20-23, 2024, USA, LAS VEGAS, NV
LAS VEGAS CONVENTION CENTER
Benefits for the client
No investments risk
You do not need to buy a station, you can buy as much the electricity as you need for your business.
Temporary and mobile solution
We have a charging station for temporary and mobile charging.
Off-grid solution
You get an autonomous solution that does not require a connection to the grid.
Low business entry point
You only pay for kilowatts of electricity, and there is no need to buy equipment
Risk-free usage
You can buy as much the electricity as you need within the required period.
Try the EV market for yourself
You can try taking your business in a new direction with minimal risk.
Real marketing support
During the period of use of the equipment you receive marketing support.
Comparison
buy station / buy the electricity
Based on an example mobile charging station (power 150 kW)
Buy off-grid station
over $ 160 K
  • $ 100 K (documented permission for 100 kW for grid connection)
  • $ 40 K (approximate minimum cost of grid charger for 100 kW power)
  • $ 10 K (estimated marketing expenses)
  • Cost of land for the station
Buy the electricity
$0,25-0,6 per kWh
(depends on location)
  • Complete off-grid solution with all necessary documentary
  • Mobile charging station with technical support
  • Free marketing support
  • Mobile charging at any time and place

Fixed station (Global version)

Mobile station (US version)

Mobile station (EU version)

Mobile station (EU version)

Process of charging
Options of stations

$0,25- 0,6

per kWh

Mobile charging station
Features
Max charging session time 40 min
Autonomous work (before refuelling) 1 day
Output voltage 400-800 V
Charging points 1-2
Fuel input Hydrogen, LNG, or a mixture of the two
Max power output per charging point 150 kW
Max charging session per day* 42
Weight, tons 7,2

$0,25- 0,6

per kWh

Fixed charging station
Features
Max charging session time 30 min
Autonomous work (before refuelling) 1 week
Output voltage 400-800 V
Charging points 2-4
Fuel input Hydrogen, LNG, or a mixture of the two
Max power output per charging point 150 kW
Max charging session per day* 100
Weight, tons 20

$0,25- 0,6

per kWh

Fixed charging station
Features
Max charging session time 30 min
Autonomous work (before refuelling) 1 week
Output voltage 400-800 V
Charging points 4
Fuel input Hydrogen, LNG, or a mixture of the two
Max power output per charging point 300 kW
Max charging session per day* 200
Weight, tons 25

$0,25- 0,6

per kWh

Power Booster
Features
Max charging session time 60 min
Output voltage 150-1000 V
Charging points 2
AC input voltage 400 V FC (+-10%)
Max power output per charging point 350 kW
Max charging session per day* 45
Weight, tons 2
*We consider charging from 30 to 80 percent to be the most efficient charge
Frequently Asked Questions
Is there a free trial available?
At the moment we do not provide this option.
Can I upgrade my equipment later?
You can upgrade the equipment through a request to the sales department

Ready for EV Charging?

Our contacts
Phone: +1-302-48-71-620
Email: This email address is being protected from spambots. You need JavaScript enabled to view it.
L-Charge Holding Inc.
Address: Suite 515, 701 Brazos St, Austin, TX 78701
Follow Us
L-charge logo
© L-Charge. All rights reserved.